Client Area

Southern Railway Train Operating Company

Southdowns was commissioned to provide noise advisory services to Southern Railway (formerly South Central) the Train Operating Company in relation to issues at a number of different sites around the south east rail network.

Brighton Depot

Following a major expansion and upgrading of Southern’s maintenance depot shed, a Statutory Noise Nuisance Notice was served on the operators of the depot by Brighton & Hove City Council in relation to a new audible warning system at the depot.

Working closely with Southern, the local authority and the contractors’ responsible for the depot fit-out, and following appropriate noise surveys at both the complainants properties and within the depot, Southdowns identified a two phase strategy to ameliorate the nuisance. The first, temporary phase, involved the immediate modification to the existing sounders within the depot shed to a lower noise speification. For the second phase Southdowns identified a series of measures to provide a more effective warning system which reduced noise breakout to nearby properties.

These included, the use of a dense array distribution of sounders placed nearer to the listeners hearing position, with an exclusion zone close to the depot doorways. The terms of the notice were met along with the important safety requirements of the final warning system.

Selhurst Depot

Following the expansion of the Selhurst depot to increase train capacity, Southern planned to re-locate a diesel re-fuelling siding and facility close to the driver’s accommodation block.

Southdowns were commissioned to measure source term noise levels from various diesel powered vehicles that were to use the facility to assist in the design of sound insulation measures at the accommodation block. This was followed by commissioning measurements to establish the effectiveness of the glazing modifications that were undertaken.

Hove Stabling Sidings

Southern commissioned Southdowns to undertake a noise assessment to identify the potential impact of a new stabling facility at Hove. Measurements were undertaken on stationary trainsets at a similar facility and used to assess the impact of stabled trains at the new site. Mitigation strategies were developed to minimise the impact on nearby properties.

Once the facility began operations, Southdowns’ staff monitored noise
levels from stationary trains in the sidings and provided advice on noise management measures as part of a site code of practice document.

Streatham Hill Down Sidings

Southdowns provided input to the acoustical specification for new plant and equipment to be installed as part of the upgrade of an existing sidings area. Working on behalf of the TOC, work also included the supervision and review of the contractors design for all noise mitigation measures applied to achieve the target levels.

Following the use of the sidings by new rolling stock, Southdowns was appointed to investigate noise emissions from stabled trains in the upgraded sidings and provide advice on mitigation measures and site management initiatives.

Most recently Southdowns has provided expert testimony on behalf of Southern at a public inquiry convened to appeal the Local Planning Authority’s enforcement notice at the premises.

Related services

Expert Witness
Asset Management / Nuisance
Railways

Related projects

Croydon Tramlink Extension
Crossrail - Parliamentary Select Committee
Channel Tunnel Rail Link Contractors
West Coast Route Modernisation - Electrification Equipment
A303 Stonehenge Improvements
Thameslink Programme - CTRL Enabling Works
Southern Region Power Upgrade
Docklands Light Railway - City Airport Extension
Westminster City Council Rail Schemes Advice
Channel Tunnel Rail Link - Rail Link Engineering
West Coast Route Modernisation - Contractor
Environment Agency - Waste Facilities
Dublin Port Tunnel
Lidsey Landfill Site, West Sussex
Former Trico Site, Dunstable
DLR Woolwich-Arsenal Extension
Lincoln Station Re-modelling
DLR Langdon Park Station
St Pancras International Station
High Speed 1 - Tunnel Ventilation Shafts
Tottenham Court Road Station Upgrade
London Underground - Cooling the Tube Programme
East London Line Extension
Crossrail
Bexhill to Hastings link road
Temporary Construction Railway - DLR Woolwich Ext.
St Louis Power Station, Mauritius
Bacton Gas Terminal
Cambridge Junction, Hitchin

Related news

Network Rail Framework
Crossrail Bill
DLR Woolwich Extension Unveiled
Railway Procurement Agency - Rep. of Ireland
Bond Street Station Upgrade

Related downloads

southdowns_general.pdf
southdowns_highspeed.pdf
southdowns_crossrail_contractors_Oct2010.pdf
southdowns_railways.pdf

© Southdowns Environmental Consultants Ltd

MAIN OFFICE
16 Station Street, Lewes,
East Sussex, BN7 2DB, UK

Tel: +44 (0)1273 488186
Fax: +44 (0)1273 488187

Reg No. 3150111

LONDON OFFICE

10 Greycoat Place, London
SW1 1SB, UK

Tel: +44 (0)207 9606255

Contact Us






website by BoxStuff