Haripur Power Station, Bangladesh

Southdowns was commissioned to advise on monitoring protocols to demonstrate compliance with national and World Bank noise standards and was subsequently tasked to visit the site to undertake detailed noise measurements before and after the power barge became operational.

To satisfy increasing demand for capacity in Bangladesh the national master plan for power generation required 2000 MW of new plant to be delivered over a five year period. To achieve these aims, private sector projects included a 120 MW barge mounted power plant located at Haripur on the Sitalakhya River.


The plant consisted of eight 16 MW reciprocating diesel engines which were enclosed on a single barge and fired on natural gas with heavy fuel oil as a pilot fuel. Various noise mitigation measures were incorporated to protect a nearby village and local school. These include relocation of the school pictured above and the construction of a new facility shown below.

Related services

Environmental Noise / Vibration Impact Assessment
Mitigation Design
Industrial / Commercial

Related projects

Somerfield / Texaco Forecourt Equipment & Shops
West Coast Route Modernisation - Electrification Equipment
A303 Stonehenge Improvements
Khartoum North Power Station, Sudan
Docklands Light Railway - City Airport Extension
A232 Bus Priority Measures
A131 Gt Notley Bypass
Channel Tunnel Rail Link - Rail Link Engineering
St Louis Power Station, Mauritius
Lewes Combined Sewer Outfall
AGT Pipelines Project
Environment Agency - Waste Facilities
Bacton Gas Terminal
Southern Water Upgrades
Lidsey Landfill Site, West Sussex
Former Trico Site, Dunstable
East Cowes IOW - SEEDA
Bracknell Town Centre Masterplan
Pompey Village Portsmouth FC
DLR Woolwich-Arsenal Extension
Biomass Power Plant, Scotland
DLR Langdon Park Station
Marchwood Power Station
Kingsway International Christian Church
Trafalgar Way, Mixed Use Development, Docklands
Preston City Centre Re-Development
London Underground - Cooling the Tube Programme
Crossrail - Parliamentary Select Committee
Bexhill to Hastings link road
High Speed 1 - Tunnel Ventilation Shafts
East London Line Extension
Newhaven Energy Recovery Facility
Super Materials Recovery Facility, Wembley
Biomass Scheme, Polegate
Coal Bed Methane Drilling

Related news

Railway Procurement Agency - Rep. of Ireland

Related downloads

southdowns_general.pdf
southdowns_planning.pdf

© Southdowns Environmental Consultants Ltd

Contact Us

Southdowns Environmental Consultants Ltd
16 Station Street, Lewes,
East Sussex, BN7 2DB, UK
Reg No. 3150111

Tel: +44 (0)1273 488186
Fax: +44 (0)1273 488187

website by BoxStuff