Southdowns was commissioned to design practical noise mitigation for Resonant Damper units which had been installed at Prestbury Station.
The requirement for this work was identified following complaints from the occupants of a nearby residential property and a subsequent British Standard BS 4142 assessment which quantified an appropriate reduction in the damper’s noise output.
The dampers posed a particularly difficult item to apply mitigation to due to their elevated nature, proximity to rail lines and electrically live components.
A site survey was therefore undertaken to determine site limitations and mitigation possibilities. Southdowns staff, with experience in practical environmental noise control, were then able to design and develop a suitable partial enclosure to provide the necessary damper attenuation.
Liaison with the client then took place to establish product constraints and criteria allowing more detailed mitigation to be developed.
The final design needed to take into account key factors such as –
In-house Computer Aided Design (CAD) skills were employed to provide drawings detailing the partial en closure design providing specialised design features.
The final design was submitted complete with a report detailing the constraints and criteria considered, and identifying key product features prior to manufacture.
Croydon Tramlink Extension
Crossrail - Parliamentary Select Committee
Channel Tunnel Rail Link Contractors
Southern Railway Train Operating Company
Thameslink Programme - CTRL Enabling Works
Southern Region Power Upgrade
Docklands Light Railway - City Airport Extension
Westminster City Council Rail Schemes Advice
Channel Tunnel Rail Link - Rail Link Engineering
St Louis Power Station, Mauritius
West Coast Route Modernisation - Contractor
DLR Woolwich-Arsenal Extension
Lincoln Station Re-modelling
DLR Langdon Park Station
St Pancras International Station
High Speed 1 - Tunnel Ventilation Shafts
Tottenham Court Road Station Upgrade
London Underground - Cooling the Tube Programme
East London Line Extension
Crossrail
Haripur Power Station, Bangladesh
Biomass Scheme, Polegate
Temporary Construction Railway - DLR Woolwich Ext.
Cambridge Junction, Hitchin
Network Rail Framework
Crossrail Bill
DLR Woolwich Extension Unveiled
Railway Procurement Agency - Rep. of Ireland
Bond Street Station Upgrade
southdowns_general.pdf
southdowns_highspeed.pdf
southdowns_crossrail_contractors_Oct2010.pdf
southdowns_railways.pdf
© Southdowns Environmental Consultants Ltd
MAIN OFFICE
16 Station Street, Lewes,
East Sussex, BN7 2DB, UK
Tel: +44 (0)1273 488186
Fax: +44 (0)1273 488187
Reg No. 3150111
LONDON OFFICE
10 Greycoat Place, London
SW1 1SB, UK
Tel: +44 (0)207 9606255