Marchwood Power Station
Baseline Noise Survey & Noise Limits

A contemporary baseline noise survey has been undertaken by Southdowns Environmental Consultants Ltd in the area surrounding the future Marchwood Power Station. This was undertaken to establish whether these contemporary levels warrant any revisions to the current permit noise conditions.

Noise and Planning