Southdowns staff began working with RLE in 1997 at the early stage of detailed design.

As part of a multi-disciplinary environmental team, the in-house noise and vibration team had a wide range of activities and responsibilities including:

  • Reviewing and advising engineers on the Project’s noise and vibration commitments.
  • Advising design teams and project engineers on specific mitigation measures to achieve commitments;
  • Liaison and negotiation with external parties (statutory bodies, Local Authorities etc), on detailed proposals submitted for planning purposes;
  • Detailed operational noise modelling of route to establish detailed noise barrier requirements and costs;
  • Detailed design of bespoke noise barriers and absorptive panels for surface and elevated sections of high speed line;
  • Development of technical specifications for the performance of resilient track systems for vibration and groundborne noise mitigation;
  • Development of tender documentation (inc. specifications) for the main construction contracts for the project;
  • Tender evaluation and technical interviews with tenderers;
  • Presentation of technical material to senior management on critical acoustical considerations and risks for project;
  • Training for RLE, Union Railways and Contractors on specific noise and vibration related issues;
  • Development of management system for Section 61 consents process across all contractors;
  • Auditing and site inspections to ensure compliance with the Project’s Environmental Management Systems;
  • Value Engineering workshops on noise barrier designs, mitigation of structure radiated noise and groundborne noise and vibration;
  • Managing the detailed FE analysis of structure radiated railway noise within the proposed station areas of the new terminus at St Pancras;
  • Detailed modelling of aerodynamic noise from ventilation shafts due to the operation of ventilation equipment and passage of high speed trains;

Project management of numerous other acoustic testing and modelling programmes including:

  • Measurements on in-line ventilation shaft components for aerodynamically induced re-radiated noise (laboratory);
  • Dynamic stiffness testing of various resilient components for track form mitigation (laboratory);
  • Scale acoustic modelling of forced ventilation equipment within tunnels (laboratory);
  • Rheostatic braking noise profiles for Eurostar trains (field);
  • Testing of noise barrier and absorptive panel designs (laboratory); and
  • FE analysis of structure radiated noise from large elevated structures to assist in track form design.

Related services

Planning & Noise
Mitigation Design
Construction
Railways

Related projects

Somerfield / Texaco Forecourt Equipment & Shops
Croydon Tramlink Extension
Crossrail - Parliamentary Select Committee
Channel Tunnel Rail Link Contractors
West Coast Route Modernisation - Electrification Equipment
Southern Railway Train Operating Company
Thameslink Programme - CTRL Enabling Works
Southern Region Power Upgrade
Docklands Light Railway - City Airport Extension
A507 Baldock Bypass
Westminster City Council Rail Schemes Advice
St Louis Power Station, Mauritius
West Coast Route Modernisation - Contractor
Lewes Combined Sewer Outfall
Dublin Port Tunnel
Former Trico Site, Dunstable
East Cowes IOW - SEEDA
DLR Woolwich-Arsenal Extension
Lincoln Station Re-modelling
DLR Langdon Park Station
Marchwood Power Station
St Pancras International Station
Olympic Skeet - Clay Target Facility
High Speed 1 - Tunnel Ventilation Shafts
Residential Development, Letchworth
Kart Racing Circuit
Tottenham Court Road Station Upgrade
London Underground - Cooling the Tube Programme
East London Line Extension
Crossrail
Haripur Power Station, Bangladesh
Biomass Scheme, Polegate
Temporary Construction Railway - DLR Woolwich Ext.
Coal Bed Methane Drilling
Cambridge Junction, Hitchin
Queensland Road Development, London

Related news

Constructionline Pre-Qualification
Network Rail Framework
Crossrail Bill
Revised BS 5228 Published
DLR Woolwich Extension Unveiled
BSi Committee
Thames Tunnel Consultation
Railway Procurement Agency - Rep. of Ireland
Bond Street Station Upgrade

Related downloads

southdowns_general.pdf
southdowns_planning.pdf
southdowns_construction.pdf
southdowns_highspeed.pdf
southdowns_crossrail_contractors_Oct2010.pdf
southdowns_railways.pdf

© Southdowns Environmental Consultants Ltd

MAIN OFFICE
16 Station Street, Lewes,
East Sussex, BN7 2DB, UK

Tel: +44 (0)1273 488186
Fax: +44 (0)1273 488187

Reg No. 3150111

LONDON OFFICE

10 Greycoat Place, London
SW1 1SB, UK

Tel: +44 (0)207 9606255

Contact Us