Client Area

Coal Bed Methane Drilling

Southdowns Environmental Consultants Ltd was appointed to undertake a ground-borne vibration survey of Coal Bed Methane (CBM) drilling on the outskirts of York.

The vibration survey was undertaken to obtain an appreciation of vibration magnitudes generated by the drilling activity and an appreciation of the potential vibration impacts that may arise at similar sites identified for CBM exploratory work. Vibration measurements were carried out during a preparatory drilling phase and during the main CBM drilling phase.

The preparatory drilling consisted the coring of the ‘mouse hole’ and main borehole using a DR-24 dual rotary drilling rig.

The drilling process involved the insertion of approximately 6 m length Tungsten shoe cases into the mouse hole and main exploratory borehole. The main drilling phase consisted of the operation of a dual rotary HH 10 2B drilling rig which drilled, from ground level, vertically downwards into the subsurface strata.

Attached to the drill head were steel cases that were used to support the borehole. After each case had been inserted into the borehole, the borehole was cleaned to remove unwanted earth.

Related services

Construction
Industrial / Commercial

Related projects

Somerfield / Texaco Forecourt Equipment & Shops
Channel Tunnel Rail Link Contractors
Thameslink Programme - CTRL Enabling Works
Southern Region Power Upgrade
Khartoum North Power Station, Sudan
Haripur Power Station, Bangladesh
A507 Baldock Bypass
Channel Tunnel Rail Link - Rail Link Engineering
St Louis Power Station, Mauritius
West Coast Route Modernisation - Contractor
Lewes Combined Sewer Outfall
AGT Pipelines Project
Environment Agency - Waste Facilities
Bacton Gas Terminal
Southern Water Upgrades
Dublin Port Tunnel
Lidsey Landfill Site, West Sussex
Former Trico Site, Dunstable
East Cowes IOW - SEEDA
Bracknell Town Centre Masterplan
Pompey Village Portsmouth FC
Biomass Power Plant, Scotland
Lincoln Station Re-modelling
Marchwood Power Station
Tottenham Court Road Station Upgrade
London Underground - Cooling the Tube Programme
Crossrail - Parliamentary Select Committee
Preston City Centre Re-Development
Trafalgar Way, Mixed Use Development, Docklands
Newhaven Energy Recovery Facility
Super Materials Recovery Facility, Wembley
Biomass Scheme, Polegate
Temporary Construction Railway - DLR Woolwich Ext.
Cambridge Junction, Hitchin
Queensland Road Development, London

Related news

Constructionline Pre-Qualification
Revised BS 5228 Published
BSi Committee
Thames Tunnel Consultation
Bond Street Station Upgrade

Related downloads

southdowns_general.pdf
southdowns_construction.pdf
southdowns_crossrail_contractors_Oct2010.pdf

© Southdowns Environmental Consultants Ltd

MAIN OFFICE
16 Station Street, Lewes,
East Sussex, BN7 2DB, UK

Tel: +44 (0)1273 488186
Fax: +44 (0)1273 488187

Reg No. 3150111

LONDON OFFICE

10 Greycoat Place, London
SW1 1SB, UK

Tel: +44 (0)207 9606255

Contact Us






website by BoxStuff