Client Area

London Underground - Cooling the Tube Programme

Southdowns was appointed to provide a range of technical services to the design and build contractor responsible for upgrading the cooling capacity of the ventilation system at two ventilation shaft sites on the Victoria Line. These services included:

  • baseline noise and vibration studies;
  • determination of target outlet noise levels for the upgraded system;
  • detailed design of noise mitigation measures for the range of operational modes of the upgraded ventilation equipment, including specification of fan attenuators, duct lining and outlet louvres and grilles;
  • detailed consideration of airborne noise breakthrough and identification of suitable mitigation options including input to detailed design of bespoke fan enclosures and large area wall treatments;
  • structureborne noise transmission path analysis.
  • preparation of Section 61 consent applications for the proposed works;
  • monitoring of demolition / construction noise and vibration using remotely downloadable equipment.
  • monitoring of vibration on sensitive electrical power systems equipment using innovative instantaneous e-mail alarm notification.

Related services

Mitigation Design
Construction
Railways

Related projects

Croydon Tramlink Extension
Crossrail - Parliamentary Select Committee
Channel Tunnel Rail Link Contractors
West Coast Route Modernisation - Electrification Equipment
Southern Railway Train Operating Company
Thameslink Programme - CTRL Enabling Works
Southern Region Power Upgrade
Docklands Light Railway - City Airport Extension
A507 Baldock Bypass
Westminster City Council Rail Schemes Advice
Channel Tunnel Rail Link - Rail Link Engineering
St Louis Power Station, Mauritius
West Coast Route Modernisation - Contractor
Lewes Combined Sewer Outfall
Dublin Port Tunnel
DLR Woolwich-Arsenal Extension
Lincoln Station Re-modelling
DLR Langdon Park Station
St Pancras International Station
High Speed 1 - Tunnel Ventilation Shafts
Tottenham Court Road Station Upgrade
East London Line Extension
Crossrail
Haripur Power Station, Bangladesh
Biomass Scheme, Polegate
Temporary Construction Railway - DLR Woolwich Ext.
Coal Bed Methane Drilling
Cambridge Junction, Hitchin
Queensland Road Development, London

Related news

Constructionline Pre-Qualification
Network Rail Framework
Crossrail Bill
Revised BS 5228 Published
DLR Woolwich Extension Unveiled
BSi Committee
Thames Tunnel Consultation
Railway Procurement Agency - Rep. of Ireland
Bond Street Station Upgrade

Related downloads

southdowns_general.pdf
southdowns_construction.pdf
southdowns_highspeed.pdf
southdowns_crossrail_contractors_Oct2010.pdf
southdowns_railways.pdf

© Southdowns Environmental Consultants Ltd

Contact Us

Southdowns Environmental Consultants Ltd
16 Station Street, Lewes,
East Sussex, BN7 2DB, UK
Reg No. 3150111

Tel: +44 (0)1273 488186
Fax: +44 (0)1273 488187

website by BoxStuff