Projects

Somerfield / Texaco Forecourt Equipment & Shops

Southdowns are retained as acoustic consultants to the project team responsible for planning and delivering refurbishment to Somerfield / Texaco petrol filling station plant and equipment across the country.

The project involves a nationwide rollout of new equipment, forecourt equipment including jet wash, car wash and air tower facilities at petrol filling stations along with the refurbishment and fit-out of Somerfield forecourt stores with new chiller and air conditioning equipment throughout the country. Southdowns are involved in preparing technical reports for planning applications, which include the identification and specification of mitigation measures where necessary.

 
Tel: +44 (0)1273 488186   Fax: +44 (0)1273 488187 Southdowns Environmental Consultants Ltd, Suite A3, 16 Station Street, Lewes, East Sussex, BN7 2DB, UK     Reg No. 3150111