Southdowns was commissioned to provide specialist advice to the Highways Agency on various possible road scheme options within the vicinity of Stonehenge World Heritage Site.

The requirement for this work was identified following the government’s aim of minimising the impacts of adjacent roads at Stonehenge. In particular the A303 trunk road, which is a key route for commercial and domestic vehicles between London and the south west, was identified as dominating the local noise environment in and around the monument.

Detailed construction and operation road traffic noise modelling was undertaken to assess the potential future effects of different tunnelled road options past the ancient monument, including investigations of specific mitigation options. Consideration of proposed road closures and the provision of a new visitor centre for the main World Heritage Site was also considered.

The use of specialist computer software allowed over 100 representative receptors to be considered in developing the most suitable road scheme. In addition specific assessments were undertaken to evaluate the potential effects on other tranquil heritage sites including ancient monuments in the vicinity of existing roads.

The coloured mapping (right) illustrates the noise contours presented around one of the proposed tunnelled sections of road. Southdowns worked with the lead consulting engineers and contractors on the scheme to provide construction and operation input to the Environmental Statement and its technical annexes.

On submission of the main Environmental Statement, Southdowns was commissioned to prepare and provide expert witness evidence at the subsequent Public Inquiry. As well as attendance at the Inquiry, Southdowns staff also provided technical support in responding to the various noise and vibration related petitions.

Related services

Expert Witness
Environmental Noise / Vibration Impact Assessment
Highways

Related projects

Crossrail - Parliamentary Select Committee
Khartoum North Power Station, Sudan
Haripur Power Station, Bangladesh
A232 Bus Priority Measures
A507 Baldock Bypass
A131 Gt Notley Bypass
Dublin Port Tunnel
Lidsey Landfill Site, West Sussex
Former Trico Site, Dunstable
Bracknell Town Centre Masterplan
Pompey Village Portsmouth FC
Biomass Power Plant, Scotland
DLR Langdon Park Station
Kingsway International Christian Church
Trafalgar Way, Mixed Use Development, Docklands
Preston City Centre Re-Development
Bexhill to Hastings link road
Westminster City Council Rail Schemes Advice
Newhaven Energy Recovery Facility
Super Materials Recovery Facility, Wembley
Southern Railway Train Operating Company
Cambridge Junction, Hitchin

Related news

Crossrail Bill
DMRB Update
Railway Procurement Agency - Rep. of Ireland

Related downloads

southdowns_general.pdf
southdowns_planning.pdf

© Southdowns Environmental Consultants Ltd

MAIN OFFICE
16 Station Street, Lewes,
East Sussex, BN7 2DB, UK

Tel: +44 (0)1273 488186
Fax: +44 (0)1273 488187

Reg No. 3150111

LONDON OFFICE

10 Greycoat Place, London
SW1 1SB, UK

Tel: +44 (0)207 9606255

Contact Us






website by BoxStuff