Channel Tunnel Rail Link Contractors

Contract 310

The C310 civil engineering contractor was required to construct a large piled slab across the Rainham marshes to provide a structurally robust platform for the new high speed railway as well as other structures and earthworks. Southdowns was involved in the initial negotiations with the local authorities on, and the development of, Section 61 applications for the works and the provision of advice on monitoring protocols.

Other issues involved concerns over vibration induced damage as a result of vibratory and percussively driven piling activities. An empirically derived prediction model was developed to enable the prediction of vibration from vibratory driven sheet piles for both disturbance and damage purposes. Elsewhere both Transco and Thames Water required strict monitoring of vibration during the percussive driving of large diameter pre-cast concrete piles across the marshes. Southdowns undertook the measurements and were able to assess the risk of damage to the pipelines and direct the piling operations accordingly in real-time as each pile was inserted.

Contract 576

C576 was responsible for the main track and overhead catenery system (OCS) installation for Section 2 of the Channel Tunnel Rail Link running from Pepper Hill in North Kent to St Pancras Station in London.

C576 operations involved constructing and operating major temporary railheads and material transfer sites in potentially sensitive areas, to service the track and OCS installation works along the CTRL trace.

Working closely with C576 engineers, Southdowns developed detailed noise calculation procedures for construction activities and for assessing the movement of engineering trains along the trace during sensitive periods of the day and night. The models were used to optimise the contractors’ construction methodologies and sequencing. Southdowns was responsible for generating construction noise and vibration management documentation for all the proposed works as well as developing the Section 61 consent applications. Noise and vibration monitoring was undertaken on this project.

Contract 588

C588 was responsible for the mechanical and electrical fit out for Section 2 of CTRL. This included the installation of in-tunnel ventilation equipment, ventilation shaft equipment, shaft headhouse structures, signalling rooms, control and communications rooms and various lineside works such as cable laying and the installation of signalling equipment.

The majority of the main C588 worksites were situated in predominantly high density residential areas with sensitive receivers in close proximity. Southdowns was responsible for developing Section 61 consent applications, advising on BPM measures including screening requirements and approproiate measures to remain within the Projects noise commitments. Southdowns also provided expert training for the contractor’s staff on noise monitoring and assisted in the procurement of monitoring equipment on its behalf.

Contract 105

Contract 105 was responsible for the re-furbishment of the St Pancras station concourse and undercroft areas, and also for the new extension to the station required to accommodate the Eurostar trains. Southdowns undertook Section 61 calculations during the main civils work stages.

Related services

Construction
Railways

Related projects

Croydon Tramlink Extension
Crossrail - Parliamentary Select Committee
West Coast Route Modernisation - Electrification Equipment
Southern Railway Train Operating Company
Thameslink Programme - CTRL Enabling Works
Southern Region Power Upgrade
Docklands Light Railway - City Airport Extension
A507 Baldock Bypass
Westminster City Council Rail Schemes Advice
Channel Tunnel Rail Link - Rail Link Engineering
West Coast Route Modernisation - Contractor
Lewes Combined Sewer Outfall
Dublin Port Tunnel
DLR Woolwich-Arsenal Extension
Lincoln Station Re-modelling
DLR Langdon Park Station
St Pancras International Station
High Speed 1 - Tunnel Ventilation Shafts
Tottenham Court Road Station Upgrade
London Underground - Cooling the Tube Programme
East London Line Extension
Crossrail
Temporary Construction Railway - DLR Woolwich Ext.
Coal Bed Methane Drilling
Cambridge Junction, Hitchin
Queensland Road Development, London

Related news

Constructionline Pre-Qualification
Network Rail Framework
Crossrail Bill
Revised BS 5228 Published
DLR Woolwich Extension Unveiled
BSi Committee
Thames Tunnel Consultation
Railway Procurement Agency - Rep. of Ireland
Bond Street Station Upgrade

Related downloads

southdowns_general.pdf
southdowns_construction.pdf
southdowns_highspeed.pdf
southdowns_crossrail_contractors_Oct2010.pdf
southdowns_railways.pdf

© Southdowns Environmental Consultants Ltd

MAIN OFFICE
16 Station Street, Lewes,
East Sussex, BN7 2DB, UK

Tel: +44 (0)1273 488186
Fax: +44 (0)1273 488187

Reg No. 3150111

LONDON OFFICE

10 Greycoat Place, London
SW1 1SB, UK

Tel: +44 (0)207 9606255

Contact Us






website by BoxStuff