Client Area

Tottenham Court Road Station Upgrade

The redevelopment of Tottenham Court Road station includes an enlarged ticket hall six times the size of the current one, a 200 per cent increase in station capacity, new entrances, five new lifts to provide step-free access and additional escalators. Other benefits will increase safety and security, enhance accessibility and improve passenger information.

Southdowns provided technical support to the MDC during the detailed design stages on the aspects of groundborne noise and vibration associated with the demolition, construction and operation phases of the re-development.

Work included: the gathering of detailed baseline groundborne noise and vibration data in a number of commercial premises surrounding the site; calculation and assessment of potential groundborne noise and vibration magnitudes during the demolition and construction phases; preparation of draft Section 61 consent applications on sub-surface works; drafting of contract documentation relating to noise and vibration requirements and monitoring; representation at meetings with the client on behalf of the MDC.

Related services

Construction
Railways

Related projects

Croydon Tramlink Extension
Crossrail - Parliamentary Select Committee
Channel Tunnel Rail Link Contractors
West Coast Route Modernisation - Electrification Equipment
Southern Railway Train Operating Company
Thameslink Programme - CTRL Enabling Works
Southern Region Power Upgrade
Docklands Light Railway - City Airport Extension
A507 Baldock Bypass
Westminster City Council Rail Schemes Advice
Channel Tunnel Rail Link - Rail Link Engineering
West Coast Route Modernisation - Contractor
Lewes Combined Sewer Outfall
Dublin Port Tunnel
DLR Woolwich-Arsenal Extension
Lincoln Station Re-modelling
DLR Langdon Park Station
St Pancras International Station
High Speed 1 - Tunnel Ventilation Shafts
London Underground - Cooling the Tube Programme
East London Line Extension
Crossrail
Temporary Construction Railway - DLR Woolwich Ext.
Coal Bed Methane Drilling
Cambridge Junction, Hitchin
Queensland Road Development, London

Related news

Constructionline Pre-Qualification
Network Rail Framework
Crossrail Bill
Revised BS 5228 Published
DLR Woolwich Extension Unveiled
BSi Committee
Thames Tunnel Consultation
Railway Procurement Agency - Rep. of Ireland
Bond Street Station Upgrade

Related downloads

southdowns_general.pdf
southdowns_construction.pdf
southdowns_highspeed.pdf
southdowns_crossrail_contractors_Oct2010.pdf
southdowns_railways.pdf

© Southdowns Environmental Consultants Ltd

MAIN OFFICE
16 Station Street, Lewes,
East Sussex, BN7 2DB, UK

Tel: +44 (0)1273 488186
Fax: +44 (0)1273 488187

Reg No. 3150111

LONDON OFFICE

10 Greycoat Place, London
SW1 1SB, UK

Tel: +44 (0)207 9606255

Contact Us






website by BoxStuff