DLR Woolwich-Arsenal Extension

Southdowns Environmental Consultants Limited was commissioned to undertake a study of the groundborne noise and vibration associated with the operation of the proposed Woolwich Arsenal Extension of Docklands Light Railway (DLR)

A number of site specific detailed models representing a range of building types and usages were developed for the study to enable a route-wide assessment of the groundborne noise and vibration predicted to arise as a result of the passage of DLR trains in the new tunnels.

The modelling exercise enabled the isolation performance specifications of track systems along the route to be defined. The primary system involves the use of a resilient baseplate assembly with other sensitive sections of the route requiring either a resilient rail-chair system or a fully floating slab track.

Specific studies were carried out to establish the mitigation requirements for a sub-surface switch and crossing section of the line, taking into account the groundborne noise and vibration generated by wheel displacements caused by trains transversing discontinuities in the rails along the S&C ‘frogs’.

The study also required demonstration of compliance with a number of Undertakings relating to target groundborne noise and vibration levels within sensitive buildings.

Related services

Mitigation Design
Railways

Related projects

Croydon Tramlink Extension
Crossrail - Parliamentary Select Committee
Channel Tunnel Rail Link Contractors
West Coast Route Modernisation - Electrification Equipment
Southern Railway Train Operating Company
Thameslink Programme - CTRL Enabling Works
Southern Region Power Upgrade
Docklands Light Railway - City Airport Extension
Westminster City Council Rail Schemes Advice
Channel Tunnel Rail Link - Rail Link Engineering
St Louis Power Station, Mauritius
West Coast Route Modernisation - Contractor
Lincoln Station Re-modelling
DLR Langdon Park Station
St Pancras International Station
High Speed 1 - Tunnel Ventilation Shafts
Tottenham Court Road Station Upgrade
London Underground - Cooling the Tube Programme
East London Line Extension
Crossrail
Haripur Power Station, Bangladesh
Biomass Scheme, Polegate
Temporary Construction Railway - DLR Woolwich Ext.
Cambridge Junction, Hitchin

Related news

Network Rail Framework
Crossrail Bill
DLR Woolwich Extension Unveiled
Railway Procurement Agency - Rep. of Ireland
Bond Street Station Upgrade

Related downloads

southdowns_general.pdf
southdowns_highspeed.pdf
southdowns_crossrail_contractors_Oct2010.pdf
southdowns_railways.pdf

© Southdowns Environmental Consultants Ltd

MAIN OFFICE
16 Station Street, Lewes,
East Sussex, BN7 2DB, UK

Tel: +44 (0)1273 488186
Fax: +44 (0)1273 488187

Reg No. 3150111

LONDON OFFICE

10 Greycoat Place, London
SW1 1SB, UK

Tel: +44 (0)207 9606255

Contact Us






website by BoxStuff