Steyning WTW

Southdowns was appointed by Southern Water’s contractor to undertake a risk assessment of future noise levels associated with the operation of equipment upgrades at the Water Treatment Works in Steyning.

The work involved baseline monitoring, a desktop risk assessment, on-site source measurements and final compliance monitoring reporting.

M&E Renewals

Southdowns has provided specialist noise and vibration expertise to one of Southern Water’s M&E Renewals contractors through a framework agreement arrangement. Projects included:

  • The measurement of baseline noise and vibration conditions at a pumping station in West Sussex prior to scheduled pumping equipment upgrades; and

  • The investigation of noise levels from a waste water treatment works in West Sussex. Particular processes and equipment identified for ameliorative measures included the blowers during backwashing.

Northbrook WSW

As part of ongoing support to a Southern Water upgrade contract, Southdowns were commissioned to assess future noise levels from an upgraded sewage works in Northbrook. This work included baseline noise monitoring, the measurement of source noise levels from the new equipment and an impact assessment.

Sandown WWTW

Commissioned to assess future noise levels associated with an expansion to current operations at the major facility on the Isle of Wight. Works included baseline noise surveys, calculation and evaluation of likely impacts and demonstration of compliance with extant planning conditions for the premises.

Related services

Industrial / Commercial

Related projects

Somerfield / Texaco Forecourt Equipment & Shops
Khartoum North Power Station, Sudan
Haripur Power Station, Bangladesh
St Louis Power Station, Mauritius
Lewes Combined Sewer Outfall
AGT Pipelines Project
Environment Agency - Waste Facilities
Bacton Gas Terminal
Lidsey Landfill Site, West Sussex
Former Trico Site, Dunstable
East Cowes IOW - SEEDA
Bracknell Town Centre Masterplan
Pompey Village Portsmouth FC
Biomass Power Plant, Scotland
Marchwood Power Station
Crossrail - Parliamentary Select Committee
Preston City Centre Re-Development
Trafalgar Way, Mixed Use Development, Docklands
Newhaven Energy Recovery Facility
Super Materials Recovery Facility, Wembley
Biomass Scheme, Polegate
Coal Bed Methane Drilling

Related downloads

southdowns_general.pdf

© Southdowns Environmental Consultants Ltd

MAIN OFFICE
16 Station Street, Lewes,
East Sussex, BN7 2DB, UK

Tel: +44 (0)1273 488186
Fax: +44 (0)1273 488187

Reg No. 3150111

LONDON OFFICE

10 Greycoat Place, London
SW1 1SB, UK

Tel: +44 (0)207 9606255

Contact Us






website by BoxStuff