Southdowns was commissioned to undertake a Stage 1 noise assessment for the proposed Great Notley Bypass in accordance with the requirements of the Design Manual for Roads and Bridges (DMRB).

The scheme comprised the extension of an existing single bypass, the A131, into a dual carriageway. A number of potentially affected sensitive receivers were identified, and aspects requiring more detailed consideration for future assessment stages were highlighted.

Follow-up work during the construction phases included a detailed quantification of the permanent noise effects likely to result from earthworks mitigation proposals at one end of the scheme adjacent to a major roundabout. A final study into the eligibility, and duty on the responsible authority, under the Noise Insulation (Amendment) Regulations 1988 was carried out as part of the project closure.
Environmental Noise / Vibration Impact Assessment
Highways
A303 Stonehenge Improvements
Khartoum North Power Station, Sudan
Haripur Power Station, Bangladesh
A232 Bus Priority Measures
A507 Baldock Bypass
Dublin Port Tunnel
Bracknell Town Centre Masterplan
Pompey Village Portsmouth FC
Biomass Power Plant, Scotland
DLR Langdon Park Station
Kingsway International Christian Church
Trafalgar Way, Mixed Use Development, Docklands
Preston City Centre Re-Development
Bexhill to Hastings link road
Crossrail - Parliamentary Select Committee
Newhaven Energy Recovery Facility
Super Materials Recovery Facility, Wembley
DMRB Update
Railway Procurement Agency - Rep. of Ireland
© Southdowns Environmental Consultants Ltd
MAIN OFFICE
16 Station Street, Lewes,
East Sussex, BN7 2DB, UK
Tel: +44 (0)1273 488186
Fax: +44 (0)1273 488187
Reg No. 3150111
LONDON OFFICE
10 Greycoat Place, London
SW1 1SB, UK
Tel: +44 (0)207 9606255